Proposal

4 wind turbines located in North Devon to the East of Witheridge at Pilliven Farm. Located on agricultural land of approximately 124 hectares.

Number of Turbines4
Generating Capacity<8 MW
Tower HeightTBC
Blade LengthTBC
Total HeightTBC
Estimated Annual Electricity*TBC
Equivalent HomesTBC
Estimated Annual C02 SavingTBC

 *Based on an average household consumption of 4700kWh [BWEA]