Proposal
4 wind turbines located in North Devon to the East of Witheridge at Pilliven Farm. Located on agricultural land of approximately 124 hectares.
| Number of Turbines | 4 |
| Generating Capacity | <8 MW |
| Tower Height | TBC |
| Blade Length | TBC |
| Total Height | TBC |
| Estimated Annual Electricity* | TBC |
| Equivalent Homes | TBC |
| Estimated Annual C02 Saving | TBC |
*Based on an average household consumption of 4700kWh [BWEA]