Welcome to Nant Bach
Nuon is looking to build an 11 turbine wind farm on a hill to the south of Llanfihangel Glyn Myfyr.
| Number of Turbines | 11 |
| Generating Capacity | 27.5MW |
| Tower Height | 60 |
| Blade Length | 40 |
| Total Height | 100 |
| Estimated Annual Electricity* | 72,270,000kWh |
| Equivalent Homes | 15,000+ |
| Estimated Annual C02 Saving | 26,700 - 62,000 tonnes/year |
*Based on:
- A capacity factor of 0.3 obtained from onsite wind measurements.
- An average household consumption of 4700kWh [BWEA].
- CO2 emissions of 270g/kWh from Gas powered generation and 860g/kWh from Coal powered generation (as agreed between the ASA and BWEA).